Close Menu
Decapitalist

    Subscribe to Updates

    Get the latest creative news from Decapitalist about Politics, World News and Business.

    Please enable JavaScript in your browser to complete this form.
    Loading
    What's Hot

    Stock Market Updates: Sensex Falls Over 350 Points, Nifty Below 25,900; IT Stocks Bleed | Markets News

    February 12, 2026

    ‘Single’ Zayn Malik shares whether he wants more kids

    February 12, 2026

    Bereaved families have ‘lost trust’ over Leeds maternity inquiry, MPs say

    February 12, 2026
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    Decapitalist
    • Home
    • Business
    • Politics
    • Health
    • Fashion
    • Lifestyle
    • Sports
    • Technology
    • World
    • More
      • Fitness
      • Education
      • Entrepreneur
      • Entertainment
      • Economy
      • Travel
    Decapitalist
    Home»Politics»Groundbreaking set for work on I-49 Arkansas River bridge
    Politics

    Groundbreaking set for work on I-49 Arkansas River bridge

    Decapitalist NewsBy Decapitalist NewsAugust 14, 2025003 Mins Read
    Share Facebook Twitter Pinterest Copy Link LinkedIn Tumblr Email Telegram WhatsApp
    Follow Us
    Google News Flipboard
    Groundbreaking set for work on I-49 Arkansas River bridge
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link


    With some prep work either finished and underway, state and local officials are set to gather Aug. 22 in Barling to ceremonially break ground on construction of the Interstate 49 bridge across the Arkansas River.

    The event, which is open to the public, is set for 11 a.m. on Aug. 22 and will include members of the Arkansas Highway Commission and officials with the Arkansas Department of Transportation (ARDOT). The groundbreaking will take place on the new bridge approach at the end of H Street in Barling, which is east of the Barling City Park.

    ARDOT in October 2024 awarded Tulsa-based Manhattan Road & Bridge a $282.5 million contract to construct a 3.1-mile stretch of I-49 between Highway 22 in Barling and Gun Club Road in Crawford County. The interchange with Arkansas Highway 22 in Barling is already complete, as is a short section of I-49 between Barling and U.S. 71 just south of Fort Smith.

    The project primarily includes a bridge across the Arkansas River, and is the first of four projects needed to build the almost 14-mile segment between Barling and the I-49 and I-40 interchange near Alma.

    According to ARDOT, the bridge will include a river relief structure, and ramps at the Gun Club Road interchange, which is in Crawford County. The awarded segment is funded by a combination of regular federal-aid highway funding, federal grant funding, Congressionally designated spending, and state funds, according to ARDOT. ARDOT estimates the cost of the total project at $1.3 billion.

    Planned Interstate 49 route between Alma and Barling

    “The I-49 Extension project, particularly the I-49 Arkansas River bridge, is a significant milestone toward our goal of completing the I-49 corridor from Fort Smith to Texarkana,” Arkansas Highway Commission Vice Chairman Keith Gibson said in a statement issued Thursday (Aug. 14). “When finished, I-49 will offer a safer and more efficient north-south highway in western Arkansas. The convergence of two major interstate highways, I-49 and I-40, in the River Valley will form a crossroads from the Canadian border to the Gulf Coast, and from the East Coast to the West Coast with the River Valley as the centerpiece.”

    Arkansas highway officials estimated in early 2022 that it would cost $4.1 billion to complete 136 miles of I-49 from Fort Smith to the Texas state line.

    “This is just the beginning of our overall goal to complete Interstate 49 in Arkansas,” ARDOT Director Jared Wiley said in the announcement. “We’re grateful for the support from our congressional delegation, our state and local elected officials and of course, the citizens of Arkansas. Without their support of Amendment 101 five years ago, none of this would be possible.”

    This job is estimated to be complete by early 2029, according to ARDOT.

    Related



    Source link

    Arkansas Bridge Groundbreaking I-49-Fort Smith metro I49 River set work
    Follow on Google News Follow on Flipboard
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email Copy Link
    arthur.j.wagner
    Decapitalist News
    • Website

    Related Posts

    When PSC reform arrived, the rhetoric made a U-turn

    February 12, 2026

    FBI’s Patel shares photos of possible suspect in Guthrie case

    February 11, 2026

    Trump’s immigration agenda roils opening days of Winter Olympics

    February 10, 2026
    Add A Comment
    Leave A Reply Cancel Reply

    Top Posts

    Coomer.Party – Understanding the Controversial Online Platform

    August 8, 2025947 Views

    Poilievre says of B.C. premier that ‘one man can’t block’ pipeline proposal

    August 8, 202580 Views

    ‘Even Warren Buffett Has Accepted…’: Robert Kiyosaki Warns Investors Of Major Shock Ahead | Markets News

    October 2, 202543 Views
    Don't Miss

    Stock Market Updates: Sensex Falls Over 350 Points, Nifty Below 25,900; IT Stocks Bleed | Markets News

    February 12, 2026 Business 02 Mins Read1 Views

    Last Updated:February 12, 2026, 11:00 ISTIndian benchmark indices Sensex and Nifty are set for a…

    Nifty, Sensex open flat in green, analysts expect range-bound movement in absence of fresh triggers | Economy News

    February 11, 2026

    No new three star restaurants as Michelin names its top spots

    February 10, 2026

    Embraer kicks off work to strengthen supply chain in India

    February 9, 2026
    Stay In Touch
    • Facebook
    • YouTube
    • TikTok
    • WhatsApp
    • Twitter
    • Instagram
    About Us

    Welcome to Decapitalist — a post-capitalist collective dedicated to delivering incisive, critical, and transformative political journalism. We are a platform for those disillusioned by traditional media narratives and seeking a deeper understanding of the systemic forces shaping our world.

    Most Popular

    Stock Market Updates: Sensex Falls Over 350 Points, Nifty Below 25,900; IT Stocks Bleed | Markets News

    February 12, 2026

    ‘Single’ Zayn Malik shares whether he wants more kids

    February 12, 2026

    Subscribe to Updates

    Please enable JavaScript in your browser to complete this form.
    Loading
    • About Us
    • Contact Us
    • Disclaimer
    • Privacy Policy
    • Terms and Conditions
    Copyright© 2025 Decapitalist All Rights Reserved.

    Type above and press Enter to search. Press Esc to cancel.